In the latest 7 days of Chicago building permit records: 177 projects likely to need cabinets, flooring, tile and paint ($243.3M in declared value).
Every lead, every morning: $149.99/month
Not ready to pay? Two free ways in.
Start a 7-day free trial: the full list every morning, no card. It stops by itself.
Get the free weekly summary: market numbers and trends once a week, for as long as you like.
| Signal | Lead | Declared value | Date |
|---|---|---|---|
| Kitchen / bath | 15XX N State Pkwy Scope: Nonstructural Interior Updates For Kitchen Remodel To Include New Cabinets, Countertops And Finishes, No M.E.P. Work. Locations: 1 Residential Unit(S), 0 Non-Resid | $100K | 2026-11-18 |
| Kitchen / bath | 36XX W Douglas Blvd Church Interior Remodel To Existing Kitchen, And Dining Areas, Provide A New Ada Restroom And New Mechanical, Plumbing At Kitchen And Restroom, New Lighting And Outlets A | $80K | 2026-11-18 |
| Kitchen / bath | 8XX W 58th St Renovation To Existing Telecommunication Antenna: Install 1 Elevated Platform With Equipmentcabinet & New 100a Electrical Service. Install 2 Microwave Dishes, 4 Saf Radio | $50K | 2026-11-17 |
| Kitchen / bath | 4XX W Division St ...Arking Lot; Adding (8) L3 Ev Charging Dispensers, (1) Power Cabinets, (1) Switchboard, (1) Ct Cabinet W/ Meter Socket, (1) Transformer (By Utility Company), (1) Switchgea | $250K | 2026-11-16 |
| Kitchen / bath | 43XX N Keeler Ave Sc 2019 Cbrc: Interior Alteration Of Existing Kitchen And Sunroom On 1st Floor Of An Existing Two-Story Wood-Frame Single-Family Residence. (Occupancy: R-5. Construction | $167K | 2026-11-16 |
| Kitchen / bath | 21XX N Lincoln Park West Scope: Nonstructural Interior Alteration To Existing Unit Includes Updates To Kithcen, Two Full Baths And One Half Bath, Replace Finshes, Counters And Fixtures. Upgrade P | $75K | 2026-11-16 |
| Kitchen / bath | 16XX N Mobile Ave ...Nd Mech Hood And Exhaust Fans To Coordinate With Updates To Kitchen Equipment Cook-Line Layout. (Occ A2 Con Iib)**Certified Corrections Subject To Field Inspections & Aud | $15K | 2026-11-18 |
| Kitchen / bath | 11XX W 94th St ...1 Residential Unit(S), 0 Non-Residential Unit(S), 1st Floor Bathroom. | $15K | 2026-11-18 |
| Latest week | 177 |
| 1 week earlier | 134 |
| 2 weeks earlier | 122 |
| 3 weeks earlier | 153 |
Latest week is 30% above the average of the weeks before it.
Largest this week: 4XX N Elizabeth St, $134.0M declared (new construction).
Built from public building permit records. Updated 2026-11-20. Signal Radar, 1515 Lakeshore Rd E, Mississauga, ON L5E 3E3, Canada